Utilities

New electrical and water infrastructure and maintenance of existing.

 

Cable Laying & Reinstatement for NIE Networks.
Installation 7.5km of cables along the B518 Stiles Way in Antrim.
Civil engineering design and construction of a 5km grid route to facilitate the connection to the grid.