Adman were appointed by Gweedore Windfarm Limited as Principal Contractor to undertake all Civil Balance of Plant works for Cronalaght Windfarm which is located in Meenderrygamph, Gweedore, Co. Donegal.
The scope of works for the project involved the design and construct of 5 no. V105 Vestas WTGs with all associated infrastructure including access tracks, crane hardstands, associated drainage works and construction of a substation compound with a 4m high retaining wall around its perimeter. Key features of the works are as follows:
- Construction of foundations for 5 no. Vestas V105 WTG’s.
- Excavation of substation compound and installation of ‘Lock and Load’ retaining structure.
- 2350m of Cable Trenching including excavation, backfill with marker tape, compaction of suitable fill material and returving.
- 5 no. 1562m2 crane pads built to specification.
- Offsite works to facilitate turbine delivery.
- Water Quality monitoring and testing.
- Construction on peat terrain.
- Site Drainage construction.