Civil Balance of Plant works at Cushaling Wind Farm Cushaling, Edenderry, Co Offaly.

Project Summary

Civil Balance of Plant works at Cushaling Wind Farm Cushaling, Edenderry, Co Offaly.

Project Detail

Adman were appointed by Statkraft as Principal Contractor to undertake all Civil Balance of Plant works for Cushaling Wind Farm which is located Cushaling, Edenderry, Co Offaly.

The scope of works for the project involved the design and construct of 9 no. VESTAS V162-6.2MW WTG’s with all associated infrastructure including access tracks, crane hardstands, associated drainage works, internal collector circuit and 4no structures including 3no river crossings. Key features of the works are as follows:

  • Design & Construct WTG foundations, hard standings, site tracks, WTG delivery route modifications, permanent & temporary works.
  • Construction of foundations for 9 no. 6.2MW VESTAS V162 WTG’s.
  • Construction of 9.4km of new minimum 5.0m wide site tracks.
  • Design and construction of a 3no permanent bridges with precast concrete beams with all necessary bank seats and bridge deck constructed on site, designed for a 16t axle loading and a 200t capacity.
  • Design & construction of 1 new Culvert crossing suitable for 16t axle loading.
  • 9 no. 2460m2 crane pads and 18 no. auxiliary crane pads built to specification.
  • Design and construction of permanent structural upgrades.
  • Design and construction of drainage works necessary to maintain the hydrology of the existing site including interfaces with the turbine foundations, roads, hardstands, substation works and all other works associated with the wind farm.
  • Design and construction of 7955m of Cable Trenching. Including excavation, backfill with marker tape, compaction of suitable fill material and returving, for internal collector circuit.
  • The design and construction of recreational amenity trail, access bridge and all associated works.
  • Water Quality monitoring and testing.