Adman worked in partnership with our Client G2 Energy to build two of the largest energy storage sites on the island of Ireland. These significant schemes at Drumkee in County Tyrone and Mullavilly in County Armagh each provide 50MW of energy storage and play an important role in the “Delivering a Secure Sustainable Electricity System” (DS3) Programme.
Our scope of works at both sites included :
- Extensive earthworks including cut/fill to formation
- Site drainage
- Construction of site access road and bell mouths at public road
- Formation of reinforced concrete foundations for battery storage containers
- Construction of brick built grid connection switch house to NIE Networks specification
- Construction of reinforced concrete transformer bund
- Earth grid installation, excavation and reinstatement
- Installation of above and below-ground cable trenches and ducts
- Installing of 2.4m high palisade security fencing