Adman were appointed by Irish Rail under the Framework for Civil Engineering Works from €50k up to €1M to undertake vital maintenance works along the Dublin to Sligo line at Division 28. The works included:
- Excavate and install 300mm twin wall pipe along the up and down side of the track along the ballast shoulder (Sleeper edge)
- Installing manholes at every 30m
- Forming 2 new headwalls around an existing 750mm culvert using concrete bag method
- Excavating aroud existing 300mm drainage line from 101mp and installing 1050mm manholes every 30m over a distance of 330m
- Topping up ballast shoulder
All works were carried out at night under a T3 possession