Adman were appointed by SSE Renewables as Principal Contractor to undertake all Civil Balance of Plant works for Lenalea Wind Farm which is located in Co. Donegal.
The scope of works for the project involved the design and construct of 7 no. 4.3MW Vestas V117 WTGs with all associated infrastructure including access tracks, crane hardstands, associated drainage works and excavation in rock for a 110kV substation platform. Key features of the works are as follows:
- Construction of foundations for 7 no. V117 Enercon WTG’s.
- Construction of 3700m of new 5m wide cut site tracks & 1100m of floated tracks including 120m of floated log road.
- Construction of substation platform.
- Construction of 2no. culvert crossings.
- Tree cutting and site clearance of approx. 18 hectares of Sitka spruce forestry prior to commencing site works.
- 4300m of Cable Trenching including excavation, direct lay cable, backfill with marker tape, compaction of suitable fill material and returving.
- 7 no. 1562m2 crane pads built to specification of varying depths.
- Upgrade to public highways.
- Water Quality monitoring and testing.
- Co-ordination with Electrical Works and Turbine Supply Contracts.
- Excavation of 2 consented borrow pits.
- Construction on peat terrain.
- Site Drainage construction.