Moanvane Wind Farm

Civil Balance of Plant works at Moanvane Wind Farm Ballykean, Geashill, Co Offaly.

Project Summary

Civil Balance of Plant works at Moanvane Wind Farm Ballykean, Geashill, Co Offaly.

Project Detail

Adman were appointed by Statkraft Ireland Limited as Principal Contractor to undertake all Civil Balance of Plant works for Moanvane Wind Farm which is located Ballykean, Geashill, Co Offaly.

The scope of works for the project involved the design and construct of 12 no. 4.8MW Nordex N133 WTGs with all associated infrastructure including access tracks, crane hardstands, associated drainage works, internal collector circuit, WF substation platform and approx. 10km of grid route along windfarm access track and public roads. Key features of the works are as follows:

  • Design & Construct WTG foundations, hard standings, permanent & temporary works, collector circuit and WTG delivery route modifications.
  • Construction of foundations for 12 no. 4.8MW Nordex N133 WTG’s.
  • Construction of 9.3km of new 4.5m wide site tracks.
  • 12 no. 1500m2 crane pads and 24 no. auxiliary crane pads.
  • Design and construction of drainage works.
  • Design and construction of 8675m of Cable Trenching including excavation, backfill with marker tape, compaction of suitable fill material and returving, for internal collector circuit.
  • Design and construction of WF Substation platform – 11,250m2.
  • Design and construct 10km of ESB grid route with 6.8km of this along local road, with remaining 3.3km within the access track on the windfarm.
  • Completed upgrade to public highways.
  • The design and construction of recreational amenity trail.
  • Water Quality monitoring and testing.