Adman were appointed by RES Group as Principal Contractor to undertake all Civil Balance of Plant works for Murley Mountain Wind Farm which is located in the townlands of Kilygordon, Edgergole and Cole Glen Forest near Fivemiletown, Co. Tyrone.
The scope of works for the project involved the design and construction of 6 no. V126 – 3.6MW Vestas WTGs with all associated infrastructure including access tracks, crane hardstands and associated drainage. Adman also constructed a substation building and external fenced compound. Key features of the works are as follows:
- Construction of foundations for 6 no. ground bearing V126 Vestas WTG bases standings, permanent & temporary works.
- Design & Construction of 3150m of new 4.5m wide cut site tracks.
- 6 no. 1562m2 crane pads built to specification.
- Construction of substation building.
- Design development and installation of 4.2km of cable trenching including excavation, direct lay cable, ducted cable, backfill with marker tape, compaction of suitable fill material and reinstatement.
- Upgrade to public highways.
- Water Quality monitoring and testing.
- Construction on peat terrain.