Adman were appointed by ABO Wind Ireland Ltd as Principal Contractor to undertake all Civil Balance of Plant works for Sheskin Wind Farm which is located in Ballymunnelly Co. Mayo in approx. 300 acres of Coillte owned forestry.
The scope of works for the project involved the design and construct of 5 no. 3.6MW Nordex N117 WTGs with all associated infrastructure including access tracks, crane hardstands, associated drainage works and approx. 10km of grid route along existing forestry track and public roads. Key features of the works included:
- Construction of foundations for 5 no. 3.6MW Nordex N117 WTG’s.
- Construction of 1500m of new 4.5m wide floated site tracks.
- 5 no. 1250m2 crane pads and 10 no. auxiliary crane pads built to specification.
- 2800m of Cable Trenching including excavation, backfill with marker tape, compaction of suitable fill material and returving, for internal collector circuit.
- Replacement of 4 no box culverts
- Replacement and upgrade of 23 no twinwall culverts up to 900mm diameter
- Installing 10.3km of ESB grid route with 3.4km of this along national road N59.
- Water Quality and turbidity monitoring and testing throughout the site.
- Working in a deep peat environment
- TDR modifications