Adman were appointed by Statkraft as Principal Contractor to undertake all Civil Balance of Plant works for Taghart Wind Farm located in Co. Cavan.
The scope of works for the project involved the design and construct of 7 Vestas V112 3.6MW WTGs with all associated infrastructure including access tracks, crane hardstands, associated drainage works and a fenced substation compound with a single storey 33kV control building/switch house. Key features of the works included:
- Construction of foundations for 7 Vestas V112 3.45-3.6MW.
- Construction of 3,300m of new 5m wide cut site tracks.
- Construction of a substation building platform.
- Construction of 3 no. culvert crossing varying from 600mm diameter to 1m box culverts.
- 13,394m of 38KVa grid route (including 13no joint bays) allowing for excavation, direct lay cable, backfill with marker tape, compaction of suitable fill material, top soiling and grass seeding across agricultural ground and in public roads including a rail and several HDD crossings
- 7 no. 1000m2 crane pads.
- Upgrade to public highways.
- Water Quality monitoring and testing.
- Archaeological monitoring of all excavation works.
- Co-ordination with Electrical Works and Turbine Supply Contracts.
- Excavation of borrow pits.
- Earthworks management.